Heavy civil planning desk

Earthwork and haulage estimator

A purpose-built planning workstation for clear inputs, transparent assumptions, and a result you can share with your team.

LIVE CALCULATIONInputs stay in the URLPlanning output only. Confirm field conditions, contract documents, and current authority requirements before relying on it.

Tool 02 · civil earthwork

Soil swell and haulage

Convert bank, loose, and compacted volumes while sizing excavation production and the truck loop.

ASTM / OSHA inputs
PLANNING RANGE$41,475 – $52,99620-ton production excavator · Lean clay (CL)
BANK / BCY2133.3In-situ volume
LOOSE / LCY2666.725% swell for haul
COMPACTED / CCY1749.318% shrink factor
Excavation13 hrs191 truckloads
Fleet17 trucks63 min cycle
Weight3093.3 tons
How to read these results
Bank / BCYMaterial in the ground before excavation.
Loose / LCYExpanded material used to plan hauling and truckloads.
Compacted / CCYEstimated placed volume used for backfill planning.
Hours and trucksPlanning estimates based on the selected machine, haul distance, and cycle assumptions.
Price rangeLive planning math using stated assumptions; it is not a guaranteed quote or independently market-validated bid.