LOCAL CONTEXTConfirm current Building Services and Development Services instructions for the exact parcel. Ask whether the work is a total demolition, partial removal, interior demolition, pool removal, or site-clearing activity. Then confirm applications, inspections, contractor requirements, utility releases, floodplain or drainage review, and any historic certificate or approval. Keep the permit allowance separate from right-of-way and future site-development work.
The permit path is not the same as a price quote. Fees, plan review, inspections, utility work, asbestos testing or abatement, traffic control, site development, and public right-of-way work may be separate responsibilities. Put each responsibility in writing so the owner can compare proposals without assuming the lowest base demolition number includes every related task.
Georgetown-area projects can include limestone, expansive soils, slopes, drainage paths, older neighborhoods, and new subdivision construction. Access for equipment and trucks should be measured from the street to the structure, including gates, overhead lines, pavement, neighbors, and staging. If the final site is intended for a new foundation, price backfill, compaction, grading, and testing as separate work.
Measure access from the public street to the work area. Record gate width, overhead clearance, turning area, pavement limits, neighbor proximity, shared drives, sidewalks, schools or businesses, staging, and truck routes. If a dumpster, crane, equipment, barricade, lane closure, sidewalk closure, driveway approach, or utility work occupies public space, identify the responsible permit and restoration obligation separately.
Confirm current requirements for the specific property before work begins.